Dover Events Calendar City Meetings Calendar SEARCH




Cochecho Waterfront Development
Community Development
Conservation Commission
Contact Us Form
Energy Advisory Committee
Home
Inspection Services
Links
Mapping
Master Plan
Reports and Publications
Services
Special Projects
Transportation

Code Enforcement Complaint Form
Conditional Use Application
Customary Home Occupation Application
Extraction Permit Application
Lot Line Adjustment Application
Merger Form
Sign Permit Application
Site Review Application
Subdivision Application
Zoning Board of Adjustment Application

2007 Build Out Analysis
2010 Planning Department Schedule
Architectural Guidelines in Dover
Census 2010 Update
Chapter 149 Site Review Regulations
Chapter 155 Subdivision of Land
Developers Handbook
FastTrans Information
FastTrans Map: Route 33
FastTrans Map: Route 34
FastTrans Map: Route 35
Form Based Code Basics
Impact Fees Explained
NonRes Transfer-Develop Rights
Planning Projects
Proposed Dover Road Impact Fee
Residential Transfer-Develop Rights
Schedule of Fees - Notice to all Applicants
Sign Requlations Explained
Site Plan Review Checklist
Site Plan Review Process
Subdivision Plan Checklist
Subdivision Plan Notes
Subdivision Process
Traffic Calming 101
Traffic Impact Assessment and Analysis Standards
Wetlands Regulations in Dover
Zoning Amendments Posted June 22, 2010
Zoning Chapter 170
Zoning Explained
Zoning Map
Zoning Tables


Master Plan
Introduction

A Master Plan is a comprehensive plan which guides the long-term physical development for a community. Each plan should be reviewed every 5—10 years. Dover’s was last updated in 2000, and is currently being reviewed in 2006. If you have questions about the review process, please contact Steve Bird in the Planning Department.

The following are brief descriptions of completed sections of Dover's Master Plan update. You may download .pdf of the chapters using the free Adobe Acrobat reader to view them. Additionally, you can view the 2010 Update on Recommendations - Executive Summary.

During the Summer of 2006, the Planning Department held a series of SpeakOut Dover! Sessions to receive input from the community about land use issues and desires. A draft of the final report summarizing the sessions is located here .

The summary presented to the Planning Board on October 9th, is here

The University of New Hampshire Survey Center conducted a telephone survey for the City of Dover in June 2007. The survey was designed to gauge citizen attitudes about the City of Dover and its future planning initiatives. Four hundred and eleven (411) randomly selected Dover residents were interviewed by telephone between June 11 and June 18, 2007. See the links below

Download UNH Master Plan Telephone Survey

Detailed tabular results of the UNH Master Plan Telephone Survey can be viewed here .

Land Use Analysis – 2007

The place we know as the City of Dover will become a different place in the course of our lifetimes. In some small way, it may even be different tomorrow. By evaluating the past and making recommendations toward the future, we can ensure that the community develops and grows in a managed and meaningful way. This plan is a statement of what the Dover community hopes to be, and how it might get there.

Download Land Use Analysis

Recreation – 2009

Recreation is an integral component of a healthy, sustainable community and should receive commensurate investment. In Dover, it is believed that Recreation issues are complex and require high attention, wise decisions, sensible implementation, and collaboration among different city departments. The goals established in this document here are similar to those in the past (2000). The mission of Recreation in Dover may not change much with each Master Plan update, but the ways in which Dover accomplishes those goals may.

Download Recreation

Natural and Historical Resources - 2000

Dover’s natural resources are a critical consideration in establishing a proper approach for land management. Understanding natural resource values provides a rational basis for determining which areas of the City are more appropriate for protection and open space and which areas are more suitable for development. Natural resources such as slope, soils, and vegetation, wildlife, and water resources add to Dover’s character, provide recreational opportunities and contribute to the quality of life for Dover residents. These natural resources also provide both opportunities and constraints for growth. Steep slopes and wetlands, for example, are less suitable for development, while better drained, flatter areas are more suitable. On the other hand, these well-drained areas may be associated with groundwater areas that require protection. Thus, the natural resource base of Dover provides an important factor as the basis for local land use decisions. The following is a description and analysis of Dover’s natural resource base.

Download Natural and Historical Resources

--------------------------------------------------------------------------------
Community Facilities and Utilities - 2009

The City of Dover and its employees are recognized as providing a high level of effective services. The Dover government is a large, complex organization delivering a wide and diverse range of services to the residents and businesses of the City. City business is conducted by the City Council managing about half of the budget and the School Board managing the rest with only bottom line funding approval by the Council. By definition it is a bureaucracy and, like most other bureaucracies, our City government and its activities has evolved over time to meet the new demands placed on it by growth. Sometimes that growth has been slow and steady and sometimes it has been very rapid such as we are currently facing as we enter the new millennium. In either case, attention has sometimes been focused on meeting the new needs rather than finding ways to deliver existing services in the most efficient way. The City and School budgets have been developed separately without first setting limits for combined growth and identifying areas of mutual need and possible joint efforts to hold costs down. This has resulted in adding new people, facilities, equipment, and activities at ever-increasing costs. Efforts at last minute budget cutting to hold cost down have sometimes been misdirected to things such as deferring necessary maintenance or new programs, which eventually resulted in higher costs. Dover needs to change that approach to managing its business.

Download Community Facilities and Utilities

--------------------------------------------------------------------------------
Open Space - 2000

Dover has a long history of placing a priority on environmental protection and management. Open Space and Recreation Plans were developed in 1973, 1978, 1988 and the 1988 City-wide Master Plan contained a detailed chapter on the open space and recreation needs of Dover. This chapter serves as an update to the 1988 Master Plan and integrates the information and recommendations contained in previous plans with the most recent needs that have been identified in Dover.

Download Open Space

--------------------------------------------------------------------------------
Transportation - 2000

This chapter of the City of Dover Master Plan is intended to set policies and goals while providing a comprehensive vision for transportation. Dover will invest in, maintain and properly manage or regulate a coordinated, safe, efficient, and effective transportation system that promotes the long-term goals of its citizens and businesses expressed in this Master Plan. The City acknowledges this system to consist of public and private infrastructure such as roads, bridges, sidewalks, parking facilities, trails and transit centers as well as services such as transit, taxis, and traveler information resources. This system will enhance the quality of life for residents and the quality of experience for visitors and tourists while preserving the character and strategic advantages of the City for current and future generations.

Download Transportation

Download Transportation Maps

Official addendum to Transportation Chapter: 2005 Rizzo Dover Downtown Traffic and Parking Circulation Study.

Download Report

Download Summary Presentation





©City of Dover, NH ::
288 Central Avenue, Dover, NH 03820 - Main Number: 603-516-6000
Settled in 1623, Dover is the oldest permanent settlement in NH and the 7th oldest in the U.S


| Register to Receive Dover Download | Web Policy | Contact Webmaster |